How often should TSCM Dri-Kleen be
applied?
TSCM Dri-Kleen should be applied
whenever the concrete begins to lose the cleanliness achieved
from prior application. Target stains should be treated as necessary.
Application frequency will vary per site based on traffic and
oil accumulation. An average fuel location is applied every 3
weeks --other structures like parking areas range from 3 to 6
months.
How much TSCM
Dri-Kleen product
should be applied per application?
TSCM Dri-Kleen coverage area can vary depending on the cement's
surface texture; rougher surfaces require more product. On average,
1 cup can cover 200 sq. ft. It is best to start with a smaller
amount of product, applying additional product more frequently
as needed. Continue sweeping to disburse adequately.
What preparations are needed before applying TSCM
Dri-Kleen?
First ensure that the cement surface is 100% dry. Next, clear
away any debris and dispose of any trash. Remember, cone off the
area to be treated and follow all safety procedures.
Do I have to block off the entire operation
when applying TSCM
Dri-Kleen?
No -only section off the work area necessary to ensure personnel
safety. After the application, the area is ready for use. You
can treat one section at a time, while leaving other areas open
for business.
How do I know when I am done applying TSCM
Dri-Kleen?
Application is complete when the product has been evenly spread
out and no excess product remains. If excess product remains,
continue sweeping product (even into new areas) until all product
is dispersed.
What is the process for cleaning up deep
oil stains?
1) For best results -use a stiff wire brush to remove heavy buildup.
2) Apply TSCM Dri-Kleen directly over the stained area.
3) If necessary, use the wire brush again to remove additional
debris from the top layers and re-apply.
The application is creating a lot of dust…
Am I doing something wrong?
An excess amount of product during application could be the problem.
Try applying the minimum amount of product required to treat a
smaller area of concrete surface. TSCM Dri-Kleen should NOT be
applied during extreme winds or gusty conditions.
Is TSCM
Dri-Kleen better than pressure
washing my location?
TSCM Dri-Kleen being a dry process is easier and friendlier to
the environment, however steam cleaning is necessary to remove
gum, coffee and other stains that are not hydrocarbons in their
composition; TSCM recommends a combination of both processes for
a complete cleaning result.
Is it true that TSCM
Dri-Kleen should be applied
to new locations before opening?
Yes. TSCM Dri-Kleen high specific gravity works to fill the pores
of concrete œ Applying product before opening creates a bioorganic
culture that works even faster to consume future stains.
Is TSCM
Dri-Kleen just cosmetic
or does it really clean the cement?
Under certain conditions an enzymatic reaction (observed turning
the stain white) can immediately begin the degradation of hydrocarbon
(oil stains) into harmless CO2. Over time, the microorganisms
contained in TSCM Dri-Kleen work to create new enzymes that actually
break down and eliminate hydrocarbons from the pores of concrete.
How Do I re-order TSCM
Dri-Kleen?
Call us on 714-841-1988 or email frank.pappano@tscmcorp.com
or frank.pappano@sbcgloabl.net
18281 Gothard Street, # 109.
Huntington Beach, CA 92646
(714) 841-1988
FAX (714) 841-3222
TSCM Dri-Kleen FAQ ©2006